From: route@monster.com
Sent: Tuesday, April 12, 2016 11:31 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: GIS Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
WILLIAM J. MOSES williammoses@live.com Cell
832-790-1617 QUALIFICATIONS SUMMARY A highly skilled Industrial Technologist
who has been in the profession for over 13 years who had the pleasure of
working on various municipal, TXDOT and residential projects that required
critical thinking, team lead and team building skills. My positions have
enabled me to share my expertise the fields such pipeline, raster
imaging,civil, electrical, telecommunication, site development and
architectural fields. I have enhanced my skill set by interpreting
various design plans, P&IDs, creating alignment sheets, interpreting
topographical surveys, traffic signaling, reading metes &bounds
documents, modifying as-built drawings, interpreting row maps, blueprints,
field notes, as-built drawings, 3D CAD tools, utilizing GIS applications to
create data maps, and creating city planning plats. I have supervised and
mentored lower level design designers. APPLICATIONS /
SOFTWARE CREDENTIALS Operating Systems: Windows XP and Vista Design
Software: AutoCAD 2008, 2009,
2010, 2011, 2012, 2013, AutoCAD Civil 3D, MicroStation V8, SolidWorks 2013,
Microsoft Office, ArcMap, ArcGIS 10.0, GEOPAK, Primavera, NetZoom SharePoint,
PowerPoint, ProjectWise, Meridian, Visio 2007, Google Earth, and Excel EDUCATION B.S.
Industrial Technology, Texas Southern
University
05/2000 PROFESSIONAL
EXPERIENCE KLOTZ
ASSOCIATES
10/2014-PRESENT CivilSite Designer Key Projects: · MAC
BUILDING · PCCA · TDCJ · PARK TEN
CENTRAL WATER PLANT Responsibilities: · Performed
field visit to investigate current conditions of the site · Utilized
Google Map to identify potential conflicts of proposed developments · Utilized
AutoCadCivil 3d to create DTM’s,alignments, and proposed/existing ditches · Created
Plan and Profiles of various existing and proposed utilities in the ground. · Submited
drawings to locate authorities for permitng and review. · Interpreted
and Modified existing pump station buldings · Utiilized
various pipeline attributes to create/modify existing pump station buildings
and sections · Designed
TCP’s,horizontal control sheets, parking lots and demolition plans TAS
ENERGY
12/2013-9/2014 Electrical Drafter (contractor) Key Projects: · Dominion
Brunswick · Alaskier
Geothread Power Plant · Australia
Pacific LNG Project Responsibilities: · Checked
AutoCAD drawing aesthetics · Performed
site visits for manufacturing of parts such as skids, motor pumps, cabinets · Observed
the installation process of motor pumps, compressor stations, cabinets,
control modules, and panduits · Modified
and created Bills of Materials for proposed projects · Interpreted
and Modified As-Built drawings for cabinets and wiring diagrams · Interpreted/Modified
existing P&ID and loop diagrams · Exposed to
SolidWorks 2013 CENTERPOINT ENERGY-HARRISBURG SERVICE CENTER
1/2013-10/2013
Electrical Drafter/Structural Drafter (contractor) Key Projects: · MD
Anderson Cancer Center · Astoria
Condominiums · Saint Luke
Episcopal Hospital · BP Oil
Petroleum Responsibilities: · Modified/
Designed structural elevations views of electrical vault rooms · Designed
framing channels for major underground vault rooms · Modified
job specific standard details for electrical vault rooms · Utilized
AutoCAD Civil 3D to view and edit existing .DWG files · Performed
basic redline markups of single line, cable trays, ladders and three
line diagrams · Utilized
ProjectWwise database to store all .DGN and .DWG files. · Utilized
MicroStation and AutoCAD to generate electrical and structural drawings · Interpreted
as-built drawings to create electrical site layout sheets · Utilized
AutoCAD Civil 3D to modify/ to show existing utilities in ground · Utilized
AutoCAD and MicroStation to generate lighting layout and ceiling layout
sheets · Reviewed
fabrication and vendor drawings for its proposed application to the project · Assisted
design engineer of the designing of the proposed projects BINKLEY & BARFIELD
2011-2013 Telecommunication Design Designer Key Projects: · Grant
Substation
· Pearland
Parkway TAS
ENERGY
12/2013-9/20/14 Electrical Drafter (contractor) Key Projects: · Dominion
Brunswick · Alaskier
Geothread Power Plant · Australia
Pacific LNG Project Responsibilities: · Checked
AutoCAD drawing aesthetics · Performed
site visits for manufacturing of parts such as skids, motor pumps, cabinets · Observed
the installation process of motor pumps, compressor stations, cabinets,
control modules, and panduits · Modified
and created Bills of Materials for proposed projects · Interpreted
and Modified As-Built drawings for cabinets and wiring diagrams · Interpreted/Modified
existing P&ID and loop diagrams · Exposed to
SolidWorks 2013 CENTERPOINT ENERGY-1111 lOUSISANA
2010-2011 Site Documentation/Telecommunication Design Designer
(contractor) Responsibilities: · Utilized
ArcMap/GIS 10.0 to extract aerial geography of proposed and existing sites · Utilized
AutoCAD and MicroStation V8 to develop property layout sheets and detail
sheets of fiber routes. · Performed
field visits and collected data to assisted in designing telecommunication
fiber shelters · Utilized
Visio to generate schematic diagrams of telecommunication networks · Utilized
ArcMap/GIS 10.0 to generate aerial maps for presentations · Utilized
ArcMap/GIS 10.0 to locate existing fiber lines in various areas of Houston · Utilized
ArcMap/GIS 10.0 to identify potential fiber conflicts with proposed
construction · Utilized
Team leader skills to train entry level designer · Utilized
AutoCAD 3D to generate .DWG proposals · Utilized
MicroStation to show detailed information of monopoles and transmission
towers · Assisted
the project manager in maintaining the progression and production of site
development projects using Microsoft products. JONES
& CARTER
2008-2010 Transportation
Civil CAD Designer
Key Projects: ·
University Corridor-Metro Light Rail ·
Cane Island Parkway Frontage Road for Interstate 10
Highway Responsibilities: · Utilized
Arc Map/GIS 10.0 to develop street modification plan & profiles sheets, · Utilized
AutoCAD 3D and MicroStation V8 to developed stormwater pollution prevention
plans, cross sections · Utilized
MicroStation V8 to design storm, water, and sanitary drainage systems · Analyzed
as built drawings for developing the project · Analyzed
and collected topographic survey maps to design proposed road way
projects · Created
alignment sheets for various utilities such as gas pipeline, storm and water · Assisted
the engineer in designing grading plans and profile sheets · Utilized
2d and 3d tools to depict contours layout sheets. · Utilized
traffic signals and signage to design traffic control plans ZARINKELK ENGINEERING
2007-2007 Senior Level
Civil Designer Key Projects: · Southeast
Corridor-Metro Light Rail Responsibilities: · Operated
ArcMap/GIS geometry to develop street modification plan & profiles sheets · Utilized
MicroStation V8 to develop Traffic Control Layouts · Mentored/Facilitated
drafting responsibities to Mid/Entry level drafters · Checked
and reviewed plans sets for accuracy and comprehension · Created
alignment sheets for various utilities such as gas pipeline, storm and water · Utilized
AutoCAD 2009 to manipulate existing DWG files · Utilized
AutoCAD 3D to modify/ create property layouts · Assisted
the engineer in designing and preparing, utility plans, site plans, grading
plans and traffic control plans · Utilized
traffic signals and signage to design traffic control plans DASHIELL CORPORATION
2006-2007 Electrical
Designer Key Projects: · Pacific
Gas & Electricity Company (P G & E) Responsibilities: · Developed
(BOM) Bills and Materials for proposed 330kv transmission substations for the
state of California · Utilized
AutoCAD to generate schematics, relays, cable trays and SCADA and wiring
diagrams · Created
details sheets and plan sheets of the proposed substation · Renovated
existing substation control house and site layouts · Imported
TIFF and JPEG images to MicroStation V8 to develop site layouts sheets. · Utilized
Meridian database to store all DGN and DWG files · Reviewed
fabrication and vendor drawings for its proposed application to the project CENTERPOINT ENERGY-1301
TRAVIS TOWER
2005-2006
Gas Pipeline
Designer (contractor) Key Projects: · Harbor
Walk · Remington
Place · Tiki
Island Responsibilities: · Assisted
the engineer in designing grading plans · Assisted
the design engineer in checking the integrity of the pipeline drawings · Utilized
ArcMap/GIS 9.1 database to extract aerial imagery in developing
property layouts · Utilized
ArcMap/GIS 9.1 to create 8 ½” x11 parcels maps for proposed areas · Utilized
MicroStation V8 to create parcel maps of gas pipelines for residential
subdivisions. · Developed
BOM’S for pipeline projects · Created
alignment sheets for various utilities such as gas pipeline, storm and water · Utilized
various pipeline fitting attributes like elbows, tees, crosses and back flow
preventers · Provided
cost estimate analysis for the proposal of gas pipelines in residential
subdivisions · Performed
field data collection to aid in the designing of gas pipelines · Performed
and assisted design engineer to create progress reports of the proposed
pipeline areas · Utilized
ArcMap/Gis 9.1 to identify potential conflicts of proposed gas pipelines · Interpreted
P&IDS to aid in the development of pipeline layouts. ESPA
CORP
2000-2005 Lead Civil Designer&Planner Key Projects: ·
Alief Parking Lot Bus Facility · University
of Houston Downtown New Classroom Building ·
University of Houston University Park Campus Parking Lots ·
City of Houston Parks of Standards ·
Aldine Independent School District ·
George R. Brown Convention Center Expansion Responsibilities: · Designed
& created Drainage Area Map Plans · Designed
demolition plans of a site · Assisted
the engineer and checking the drawings for accuracy and comprehension · Designed
structural pavement layout sheets and foundations utilizing AutoCAD 2002 and
COH design standards · Utilized
MicroStationV8 & AutoCAD to design site layouts, grading and proposed
utility drainage plan and profile sheets · Performed
routine redlines of site layouts, grading and proposed utility drainage plan
and profile sheets · Designed
& created Storm Water Prevention Plans · Performed
data measurements and collections to aid in the development of various
projects · Utilized
AutoCAD 2002 to create horizontal control layouts ·
Conversed with local municipalities and clients to
complete plats for recordation · Incorporated
Excel tables into DWG files to illustrate DAMP acreages and x,y
coordinates of
horizontal control plans · Utilized
traffic signals and signage to design traffic control plans |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|